Fuel Outfeeder
Units: °F °C
Index Name Units Boiler 1Boiler 2
Current Value Last Changed Prev. ValueCurrent ValueLast ChangedPrev. Value
61 Start of 1st pellet filling h 4.50 2013-12-27 10:28:14 (GMT-5) 4.50 2.50 2014-01-24 09:52:28 (GMT-5) 3.50
517 Start of 2nd pellet filling h 4.50 2014-01-24 09:45:40 (GMT-5) 17.00 2.50 2014-01-24 09:53:54 (GMT-5) 18.12
65 Refill of cyclone from % 0 2014-08-11 16:02:40 (GMT-5) 45 0 2014-08-11 15:58:28 (GMT-5) 45
912 Refill cyclone after buffer charging? 1 2014-01-24 09:45:40 (GMT-5) 0 1 2014-01-24 09:53:54 (GMT-5) 0
922 Vacuum + screw filling run-on applies after reaching the MAX fill level s 4 2013-12-27 10:28:14 (GMT-5) 4 0 2014-01-10 08:48:11 (GMT-5) 2
483 Maximum time until switching of probe m 20 2013-12-27 10:28:14 (GMT-5) 20 20 2014-01-24 09:55:55 (GMT-5) 10
636 slide valve installed on pellet cyclone 1 2013-12-27 10:28:14 (GMT-5) 1 1 2013-12-27 10:28:22 (GMT-5) 1
196 Measured path of slide valve % 83 2021-08-05 11:35:55 (GMT-5) 0 81 2021-08-19 11:06:00 (GMT-5) 0
709 Minimum path for slide valve % 1.5 2013-12-27 10:28:14 (GMT-5) 1.5 1.5 2013-12-27 10:28:22 (GMT-5) 1.5
662 P4 Pellet 32/38 with small cyclone installed 0 2013-12-27 10:28:14 (GMT-5) 0 0 2013-12-27 10:28:22 (GMT-5) 0