Fuel Outfeeder
Units: °F °C
Index Name Units Boiler 1Boiler 2
Current Value Last Changed Prev. ValueCurrent ValueLast ChangedPrev. Value
61 Start of 1st pellet filling h 0 2015-10-14 14:09:25 (GMT-5) 5.00 0 2015-10-14 14:09:25 (GMT-5) 5.00
517 Start of 2nd pellet filling h 0 2015-10-14 14:09:25 (GMT-5) 5.00 0 2015-10-14 14:09:25 (GMT-5) 5.00
65 Refill of cyclone from % 10 2019-01-21 10:50:05 (GMT-5) 35 10 2019-01-21 10:50:04 (GMT-5) 35
912 Refill cyclone after buffer charging? 0 2014-02-07 10:28:17 (GMT-5) 1 0 2014-02-07 10:28:21 (GMT-5) 1
922 Vacuum + screw filling run-on applies after reaching the MAX fill level s 2 2015-02-16 18:11:45 (GMT-5) 3 3 2013-10-26 01:26:12 (GMT-5) 3
483 Maximum time until switching of probe m 30 2013-11-21 10:00:13 (GMT-5) 25 25 2014-01-16 14:41:27 (GMT-5) 30
636 slide valve installed on pellet cyclone 1 2018-01-25 11:24:10 (GMT-5) 0 1 2013-10-26 01:26:12 (GMT-5) 1
196 Measured path of slide valve % 81 2021-12-26 17:21:32 (GMT-5) 0 81 2021-12-26 17:21:32 (GMT-5) 0
709 Minimum path for slide valve % 1.0 2014-11-21 16:38:14 (GMT-5) 1.5 1.0 2014-11-21 16:43:45 (GMT-5) 1.5
662 P4 Pellet 32/38 with small cyclone installed 0 2013-10-26 01:26:04 (GMT-5) 0 0 2013-10-26 01:26:12 (GMT-5) 0