Fuel Outfeeder
Units: °F °C
Index Name Units Boiler 1Boiler 2Boiler 3
Current Value Last Changed Prev. ValueCurrent ValueLast ChangedPrev. ValueCurrent ValueLast ChangedPrev. Value
61 Start of 1st pellet filling h 0 2015-10-13 13:59:41 (GMT-5) 5.00 0 2015-10-13 13:59:41 (GMT-5) 5.00 10.17 2020-12-15 10:18:38 (GMT-5) 24.00
517 Start of 2nd pellet filling h 0 2015-10-13 13:59:25 (GMT-5) 5.00 0 2015-10-13 13:59:25 (GMT-5) 5.00 0 2015-10-13 13:59:25 (GMT-5) 5.00
65 Refill of cyclone from % 15 2015-01-21 19:09:09 (GMT-5) 0 15 2015-01-20 08:50:30 (GMT-5) 0 15 2015-01-21 19:09:09 (GMT-5) 0
912 Refill cyclone after buffer charging? 0 2014-08-29 17:15:08 (GMT-5) 0 0 2014-08-29 17:15:11 (GMT-5) 0 0 2014-08-29 17:15:14 (GMT-5) 0
922 Vacuum + screw filling run-on applies after reaching the MAX fill level s 0 2014-08-29 17:15:08 (GMT-5) 0 0 2014-08-29 17:15:11 (GMT-5) 0 0 2014-08-29 17:15:14 (GMT-5) 0
483 Maximum time until switching of probe m 20 2014-08-29 17:15:07 (GMT-5) 20 20 2014-08-29 17:15:10 (GMT-5) 20 20 2014-08-29 17:15:13 (GMT-5) 20
636 slide valve installed on pellet cyclone 1 2014-08-29 17:15:07 (GMT-5) 1 1 2014-08-29 17:15:11 (GMT-5) 1 1 2014-08-29 17:15:14 (GMT-5) 1
196 Measured path of slide valve % 81 2021-09-09 10:40:46 (GMT-5) 0 82 2021-09-09 12:03:38 (GMT-5) 0 82 2021-09-09 11:25:50 (GMT-5) 0
709 Minimum path for slide valve % 1.5 2014-08-29 17:15:07 (GMT-5) 1.5 1.5 2014-08-29 17:15:11 (GMT-5) 1.5 1.5 2014-08-29 17:15:14 (GMT-5) 1.5
662 P4 Pellet 32/38 with small cyclone installed 0 2014-08-29 17:15:07 (GMT-5) 0 0 2014-08-29 17:15:11 (GMT-5) 0 0 2014-08-29 17:15:14 (GMT-5) 0